Showing 1501-1550 of 4,980 results
| Unit Id | Item | Date Range | Description 1 | Description 2 | Description 3 | Description 4 | Description 5 |
|---|---|---|---|---|---|---|---|
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0610 | BARKER gravity station values. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0309 | Kenmore 2 copper prospect, cross section 8400 north. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0538 | Eucla Basin, structural lineaments. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0294 | Alberts Sand Pit Pty Ltd, section 336, Hundred of Willunga. Geological cross sections. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0300 | Plan showing depths to magnetic basement within Pedirka and Arckaringa Basins. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0401 | Plan showing the results of the Kenmore 2 copper deposit, induced polarisation survey, line 4000N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0404 | Plan showing the results of the Kenmore 2 copper deposit, induced polarisation survey, line 4800N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0704 | Adelaide stream sampling, sample locations 'G' numbers (1973), Adelaide D. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0713A | Guerin's Aggregate Quarry Sec 533 Hd of Mobilong Sections D-D, E-E, F-F | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0743 | South-East water resources, Padthaway. Investigation, aquifer test, Naracoorte Range 18 to 20 September 1973. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0793 | Little Bimba Mine feldspar deposit. Geological plan, MC 6933. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0922 | Langhorne Creek, Milang, resistivity survey, basement (Kanmantoo) contours, interpreted from resistivity depth probes. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0388 | Plan showing the results of the Kenmore 2 copper deposit, induced polarisation survey, line 11000N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0568 | Tarcoola to Alice Springs railway, Utah Bore dolerite deposit. Proposed quarry area, cross sections. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0302 | Curnamona gravity survey, March 1973, Bouguer, regional and residual gravity profiles, lines 15 and 16. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0540 | Marree, standard sheet. Map showing prominent structural lineaments. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0601 | Tarcoola to Alice Springs railway. Seismic refraction survey of river crossings, Outounya Crossing, locality plan. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0611 | BARKER Bouguer anomaly map. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0376 | Plan showing the results of the Kenmore 1 copper deposit, induced polarisation survey, line 6400N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0379 | Plan showing the results of the Kenmore 1 copper deposit, induced polarisation survey, line 7600N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0403 | Plan showing the results of the Kenmore 2 copper deposit, induced polarisation survey, line 4400N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0736 | Willyama Inlier fold trend map and cross sections. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0762 | Adelaide to Port Pirie railway standardisation ballast site, Redhill Quarry. Geological cross sections A, B, C, D. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0919 | South-East water resources, Padthaway area. Isohalsines for November 1973. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0418 | Plan showing the results of the Kenmore 2 copper deposit, induced polarisation survey, line 4800S. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0516 | Railway bridge, Yorkey Crossing. Vertical electrical soundings 1 and 2. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0614 | ABMINGA gravity station values. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0623 | OLARY Bouguer anomaly map. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0649 | Barossa Dam, Topographic cross section of the valley. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0939 | South-East water resources, Padthaway area. Water table contours for February 1970. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0384 | Plan showing the results of the Kenmore 1 copper deposit, induced polarisation survey, line 9600N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0389 | Plan showing the results of the Kenmore 2 copper deposit, induced polarisation survey, line 11200N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0390 | Plan showing the results of the Kenmore 2 copper deposit, induced polarisation survey, line 11400N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0392 | Plan showing the results of the Kenmore 2 copper deposit, induced polarisation survey, line 11800N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0570 | BURRA 1;250,000 | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0580 | Tarcoola to Alice Springs railway. Seismic refraction survey of river crossings, Hugh River location of seismic traverses. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0605 | BURRA Bouguer anomaly map. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0536 | Geological survey of South Australia. Map showing structural lineaments.Sheet 1of 4 S.W | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0536A | Geological survey of South Australia. Map showing structural lineaments.Sheet 2 of 4 S.E. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0539 | Prominent structural lineaments in South Australia. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0305 | Kenmore 2 copper prospect, cross section 7600 north. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0307 | Kenmore 2 copper prospect, cross section 10400 north. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0348 | Eyre Highway groundwater survey, drawdown test, bore 3A, section 12, Hundred of Giles, County of Kintore. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0350 | Eyre Highway groundwater survey, drawdown and recovery test, bore 3A, Section 12, Hundred of Giles, County of Kintore. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0371 | Plan showing the results of the Kenmore 1 copper deposit, induced polarisation survey, line 12800N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0372 | Plan showing the results of the Kenmore 1 copper deposit, induced polarisation survey, line 13200N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0373 | Plan showing the results of the Kenmore 1 copper deposit, induced polarisation survey, line 5200N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0375 | Plan showing the results of the Kenmore 1 copper deposit, induced polarisation survey, line 6000N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0378 | Plan showing the results of the Kenmore 1 copper deposit, induced polarisation survey, line 7200N. | RDS 1524: 11.2 | ||
| 14 | Item | 01 Jan 1973 - 31 Dec 1973 | 1973-0405 | Plan showing the results of the Kenmore 2 copper deposit, induced polarisation survey, line 5200N. | RDS 1524: 11.2 |