Showing 2001-2050 of 4,980 results
| Unit Id | Item | Date Range | Description 1 | Description 2 | Description 3 | Description 4 | Description 5 |
|---|---|---|---|---|---|---|---|
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0764 | Noora Basin evaporation study, drawdown vs log time, recovery CTL 10-CTL10B, 1-2 May 1975. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0766 | Noora Basin evaporation study, drawdown vs log time recovery CTL10-CTL10B, 9 May 1975. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0693 | Southern Pirie-Torrens Basin, Hd Wanderah, bore details plan, 23/7/1975, 1:31 680. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0908 | EVERARD aeromagnetic map of total intensity. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1012 | Willunga slate deposits, Bastians quarry, northern face, 1:100. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0689 | Southern Pirie-Torrens Basin, Hd Mundoora, bore details plan, 23/7/1975, 1:31 680. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0692 | Southern Pirie-Torrens Basin, Hd Pirie, southern portion, bore details plan, 23/7/1975, 1:31 680. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1040 | Moomba gasfield, Daralingie beds isopach, 1:100 000. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0707 | Location of borehole R, 29/7/1975, Eyre Peninsula, Lincoln Basin groundwater survey. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1016 | Willunga slate deposits, Delabole middle quarry, 10/11/1975, 1:100. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1030 | VERRAN aeromagnetic map of total intensity, 14/11/1975, 1:63 360. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1041 | Moomba gasfield, Unit I isopach, 1:100 000. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0574 | HUGHES Seismic Survey, aeromagnetic map of total intensity, 3/6/1975, 1:63 360. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0604 | NULLARBOR aeromagnetic map of total intensity. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0698 | Adelaide Stream Sampling. Geometric rolling mean of lead.Fig 10 | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1000 | Earea Dam, Glenloth grid location, drill hole locality map, 30/10/1975, 1:47 520. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0570 | HAMBIDGE Seismic Survey, aeromagnetic map of total intensity, 3/6/1975, 1:63 360. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0573 | OLDHAM Seismic Survey, aeromagnetic map of total intensity, 3/6/1975, 1:63 360. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0578 | COOK Seismic Survey, aeromagnetic map of total intensity, 3/6/1975, 1:63 360. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0679 | Milang Langhorne Creek groundwater study. Potentiometric surface contours September 1974, confined aquifer. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0687 | Southern Pirie-Torrens Basin, Hd Winninowie, bore details plan, 23/7/1975, 1:31 680. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1035 | KAPPAWANTA aeromagnetic map of total intensity, 14/11/1975, 1:63 360. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0772 | Monarto construction material, Mannum Limestone Formation, Murray Bridge, logs of diamond DH, 25/8/1975, 1:125. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0892 | Hd Moorooroo, secns 3120, 845, Micaceous, hematite deposit, measured sections along cross cut wall, 24/9/1975, 1:200. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0695 | Southern Pirie-Torrens Basin, Hd Telowoe, bore details plan, 23/7/1975, 1:31 680. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1033 | LOCK aeromagnetic map of total intensity, 14/11/1975, 1:63 360. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1034 | TOOLIGIE aeromagnetic map of total intensity, 14/11/1975, 1:63 360. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1042 | Moomba gasfield, Unit II isopach, 1:100 000. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0680 | Milang Langhorne Creek groundwater study. Potentiometric surface contours March 1975, confined aquifer. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0594 | South-East groundwater resources, Mount Gambier area, Gambier Limestone. Isopach map and Pleistocene recent sediments, June 1975, 1:100 000. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0603 | COOMPANA aeromagnetic map of total intensity. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0673 | Milang Langhorne Creek groundwater study. Dim observation bore hydrographs, monthly, Langhorne Creek, 1970-75. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0750 | Lincoln Basin, area A, borehole R, 72 hour pump test results, 18/7/1975. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0755 | Noora Basin evaporation study, graphical determination of t10 and t90 and hydrogeological model. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0914 | Bimba Hill, Mount Howden Mine area. Geological sketch map, 6/10/1975, 1:63 360. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1011 | OOLDEA aeromagnetic map of total intensity. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0691 | Southern Pirie-Torrens Basin, Hd Napperby, bore details plan, 23/7/1975, 1:31 680. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1102 | Nullarbor Fowler geophysical investigation, interpretation map. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0575 | BUNDULLA Seismic Survey, aeromagnetic map of total intensity, 3/6/1975, 1:63 360. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0769 | Noora Basin evaporation study, log drawdown vs log time CTL9-CTL9B, 4/6/1975. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0910 | BIRKSGATE aeromagnetic map of total intensity. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1003 | Inkerman no. 37, composite well log, October 1975, 1:200. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1023 | Northern Adelaide Plains groundwater study, stage II, geological section PP-QQ, 12/11/1975. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0684 | Southern Pirie-Torrens Basin, borehole survey locality plan, July 1975, 1:250 000. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0685 | Willochra Basin, 1975, Refraction Seismic Survey, 17/7/1975, 1:6 100. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1048 | Moomba gasfield, Unit III isopach, pay sand isopach. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-1113 | Hd Encounter Bay, status of water wells, December 1975, 12/12/1975, 1:31680. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0576 | CHOOLKOONING Seismic Survey, aeromagnetic map of total intensity, 3/6/1975, 1:63 360. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0616 | Monarto Aggregate Project, Mannum Limestone Formation, Murray Bridge. Geology, borehole locations, 17/6/1975, 1:10 000. | RDS 1524: 11.2 | ||
| 18 | Item | 01 Jan 1975 - 31 Dec 1975 | 1975-0671 | Lake Frome, Tertiary, fence diagram, 7/3/1975, vert 1:1 000. | RDS 1524: 11.2 |