Showing 3901-4000 of 4,980 results
| Unit Id | Item | Date Range | Description 1 | Description 2 | Description 3 | Description 4 | Description 5 |
|---|---|---|---|---|---|---|---|
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0332 | Chambers aeromagnetic map of total intensity | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0755A | Variation diagrams of some northern Eyre Peninsula rocks. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0758 | Fig. 6, Time-rock diagram for Adelaide system and older precambrian sequences | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0924 | Composite well log light No. 1, 4 mile sheet Adelaide Hundred of Port Gawler. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1962 - 31 Dec 1962 | 1964-0814/6 | Radiometric Results airborne survey, TORRENS, South Australia 1962 | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0060 | Underground water survey Benda Station pastoral leases 1804 and 1806 Blk 932. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0565 | 6634-IV Wilpena standard sheet base map. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0676 | Underground water survey sections 64, 66, 67, 73, 108, 113, 139, 149, 150, 1484, 1488, 1566, 1574, 1575 and 1586 Hundred of Kapunda. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0329 | Kokatha aeromagnetic map of total intensity | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0751 | North Para river proposed deviations and water table contours at 11.3.64. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0792 | Section 172 Hundred of Kekwick, well and aquifer loss curves. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0797 | Sturt River Dam left abutment. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0015 | Southern end of Lake Torrens geophysical reconnaissance gravity and magnetic profiles traverses KL BN and PL. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0200 | Murray Basin South Australia refraction lines 1961. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0255 | Greenpatch Jaspilite structure Canga Hill section along drill hole GD 3. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0325 | Jellabinna aeromagnetic map of total intensity | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0561 | Edeowie standard sheet base map. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0372 | Bute silo site locality and geological plans. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0531 | Underground water survey Nundroo station part Hundreds of Miller Russell and Wookata. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0790 | Recovery test bore 1 section 172 Hundred of Kekwick. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-1007 | Chowilla project Noora quarry site geological sketch plan. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0590 | Gidgealpa magnetic survey plan of traverses Murta Murta section. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0602 | Gidgealpa magnetic survey total magnetic profiles Murta Murta section. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0712 | Ground water survey Bk 4 Hundred of Riddoch Mount Burr saw mill. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0719 | Chowilla project borrow area A left bank geological plan sheet 2. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0042 | Geophysical reconnaissance southern end of Lake Torrens gravity and magnetic profiles traverse BN. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0170 | Murray Basin South Australia refraction lines 1962. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0245 | Middle River damsite Kangaroo Island preliminary geological plan and cross section showing proposed diamond drill holes. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0258 | Greenpatch Jaspilite structure Hillside deposit section along drillhole GD 6. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0581 | Nackara 60 chains to one inch | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0713 | Precambrian South Australia tectonic. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0768 | Sturt River dam left abutment. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0925 | Pre quaternary geological map Adelaide plains and western Mount Lofty. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0203 | North Adelaide Plains gravity contours. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0232 | Polda pump test bores 1and 3 trench graph of discharge drawdown and recovery. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0240 | Nunjikompita silo site locality and geological plan. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0285 | Proposed elevated tank section 77 Hundred of Duncan Kangaroo Island geological plan and section. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0333 | Tolmer aeromagnetic map of total intensity | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0338 | New government office building Victoria Square foundation test bores 2 and 4 composite columnar sections correlated with new reserve bank foundation test bore 4. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0408 | Proposed store for South Australia Gas Co. Bromptom section 57 Hundred of Yatala locality plan showing auger hole position and geological section AA BB. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0474 | Sturt River flood control dam upper right bank preliminary geological section. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0568 | Hawker standard sheet base map. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0872 | Continous velosity logs through transition beds equivalents. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-1109 | Beach Petroleum NL Black Point No. 1A well. | RDS 1524: 11.2 | ||
| 33 | 01 Jan 1962 - 31 Dec 1964 | Departmental plans. | |||||
| 33 | Item | 01 Jan 1962 - 31 Dec 1962 | 1964-0812/6 | Radiometric Results airborne survey, ANDAMOOKA, South Australia 1962 | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0137 | Kolendo run groundwater prospects pastoral lease 1649 block 316C. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0175 | Underground water survey section 19 Hundred of Petherick - N.N. Birks. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0177 | Drainage investigtion Hundred of Noarlunga part section 32 town planner VM Pentelow and L Rimes. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0231 | Polda Basin salinity and locality plan. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0249 | Burra resistivity and metal factor contours lines 6 - 5N - 4N. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0256 | Greenpatch Jaspilite structure Metallurgical Hill section along drillhole GD 4. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0259 | Greenpatch Jasperlite structure Woolshed Hill drillhole GD 2. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0277 | Major tectonic units and fracture systems in South Australia | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0326 | Yerda aeromagnetic map of total intensity | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0562 | Oraparinna standard sheet base map. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0570 | Willochra standard sheet base map. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0572 | Koonamore standard sheet base map. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0579 | Melrose 60 chains to one inch | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0375 | Underground drainage survey proposed subdivisions part section 26 and 27. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0405 | Fortville no. 3 bore core no. 2 3371-3384 feet recovery 13.0 feet. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0494 | Gidgealpa magnetic survey locality plan. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0654 | Spencer Gulf TV tower foundation area geological plan and section. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0772 | Dolomitic shale deposit Yongala north of section 161 Hundred of Mannanarie highways geological plan. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-1002 | Figure 12 Fortville bores 2 and 3 Micropalaeontological log. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-1029 | Proposed ETSA Department substation Para section 5673 Hundred of Munno Para locality plan showing position of foundation on test drill holes. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0564 | Cotabena standard sheet base map. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0339 | Streaky Bay silo site bore location plan. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0385 | Drainage investigation part section Hundred of Onkaparinga Bridgewater. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0831 | Coca Cola bore, Hundred of Adelaide, section 1 lot 49. Drawdown and recovery curves 17/9/1964. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0970 | Middle River dam Kangaroo Island quarry site No. 1 geological sketch plan and sections. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0593 | Eyre Peninsula north east geological plan and section. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0639 | Morphett Street and Victoria Bridges foundation stratigraphy. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0720 | Chowilla project borrow area A left bank geological plan sheet 1. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0199 | Southern end of Lake Torrens geophysical survey gravity and magnetic profiles traverses plan. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0204 | Adelaide plains north gravity profiles plan. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0569 | Baratta standard sheet base map. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0576 | 6532-IV Wilmington 60 chains to one inch | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0578 | Paratoo 60 chains to one inch | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0589 | Proposed 1,000,000 gallon tand section 14 Hundred of Baroota geological plan, section and log. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0605 | Polda Basin resistivity survey apparent resistivity curves at nine bores. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0618 | Tailem Bend pumping station locality plan and diagrammatic section showing geology and borehole positions. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0657 | Underground water survey PL 2362 Mutooroo pastoral Co. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0410 | Greenpatch Jaspilite structure comparison of factors affected by iron content specific gravity magnetism acid soluble iron diamond drill holes GD 2-7. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0415 | Sturt River flood control dam foundation geology plan and ray sections. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0330 | Crabring aeromagnetic map of total intensity | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-1009 | Underground water survey section A Hundred of Hay. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-1034 | Plan and longitudinal section of the West Burra Mine, Section 116 Hundred of Hanson. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-1066 | Tarcoola area EM and IP grid and anomalies. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-1119 | Ground water prospect Pinnaroo Bordertown Highway. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0248 | Geological plan Mount Toondina. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0563 | Reaphook standard sheet base map. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0566 | Willippa standard sheet base map. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0575 | Waukaringa 60 chains to one inch | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0580 | Peterborough 60 chains to one inch | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0789 | Paruna School bore recovery test, Hundred of Kekwick, section 7. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0791 | Hundred of Kekwick, section 172 bore 1 step draw down test. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0854 | Borrow area B right bank geological sections. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0980 | Drainage survey part section 95 Hundred of Noarlunga east pt ct 3187 3184. | RDS 1524: 11.2 | ||
| 33 | Item | 01 Jan 1964 - 31 Dec 1964 | 1964-0621 | Nilpena area Peak Denison ranges geological plan and section. | RDS 1524: 11.2 |