Item
An individual file or volume within a box
92/00045 Upper South-East dryland salinity and flood management plan. Excavation characteristics and slope design for the drainage channels.
Part of
Date range:
01 Apr 1992 - 01 Apr 1992
Public Access:
Open
Description 1: 92/00045
Description 2: Upper South-East dryland salinity and flood management plan. Excavation characteristics and slope design for the drainage channels.
Description 3: There is no data to display
Description 4: There is no data to display
Description 5: RDS 1524:11.3
Link copied